We had the honour of engaging in the Bakam 33/11kV Modular Substation’s Engineering, Procurement, Construction, and Commissioning (EPCC). The modular substation, one of the first in Sarawak, is part of a drive to transition from a conventional grid system to a smart grid system. The modular substation is prefabricated and pre-commissioned off-site. What distinguishes it from regular substations is that it outperforms them in terms of cost-effectiveness and construction safety.
图库
Bakam 33/11kV模块化变电站的设计与建造
Sarawak, Malaysia
We had the honour of engaging in the Bakam 33/11kV Modular Substation’s Engineering, Procurement, Construction, and Commissioning (EPCC). The modular substation, one of the first in Sarawak, is part of a drive to transition from a conventional grid system to a smart grid system. The modular substation is prefabricated and pre-commissioned off-site. What distinguishes it from regular substations is that it outperforms them in terms of cost-effectiveness and construction safety.